|
Rybinsk Hydroelectric Station or Rybinsk GES ((ロシア語:Ры́бинская ГЭС)) is a hydroelectric station on the Volga and the Sheksna rivers in Yaroslavl Oblast near the Rybinsk town. it is the third of the Volga-Kama Cascade of dams. == General data == Construction began in 1935 and was completed in 1950. The complex consists of *Concrete spillway dam on the Volga river, *Earth-fill dam on the Volga river, 524 m long and 27 m high *Single-lane, single-chamber lock on the Volga river *Earth-fill dam on the Sheksna river, 470 m long and 35 m high *Left-bank and righ-bank dams on the Sheksna river, with total length of 6035 m. *Powerhouse on Sheksna river. Installed power is 356.2 MW, average annual production is 644 GWh. Power house has 6 generators with Kaplan turbines, working at 13.4 m head: 3 of 55 MW each, 2 of 63.2 MW each and 1 of 65 MW. The dam forms Rybinsk Reservoir. A highway passes over the Volga river on the dam. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Rybinsk Hydroelectric Station」の詳細全文を読む スポンサード リンク
|